National Lift Tower

OVERVIEW

Aliaxis, a global leader in fluid management solutions, operates the iconic LIFT TOWER—an engineering marvel standing at 127 metres (418 ft). Originally built in 1982 for lift safety testing, the tower has evolved into a multi-purpose facility used for high-rise drainage testing, specialist training, and media productions. It holds the distinction of being the UK’s tallest permanent abseil and the world’s most advanced computer-controlled drainage testing rig.

To support its expanding operations, Aliaxis partnered with MPR Technical Services to upgrade the tower’s network infrastructure, ensuring it could meet the demands of modern testing and training environments.

THE CHALLENGE

The LIFT TOWER’s unique design and diverse usage presented a significant challenge: delivering a resilient, high-performance network across 15 floors. The infrastructure needed to support:

  • Advanced computer-controlled testing systems
  • Specialist training activities
  • Media production requirements
  • Future scalability and technological upgrades

TAILORED SOLUTION

Having previously worked with Aliaxis on fibre installations, including a successful project in Lenham, Kent, MPR Technical Services was the trusted choice for this complex undertaking.

Key elements of the tailored solution included:

  • Custom network design to suit the tower’s vertical layout and operational needs.
  • Diverse fibre backbone for high-speed, reliable connectivity.
  • Copper edge system to support legacy and peripheral devices.
  • Strategic placement of wireless access points to ensure full coverage across all floors.
  • Supply and installation of blown fibre and network cabinets for optimal performance and future expansion.

OUR SOLUTION

MPR designed and installed a comprehensive core network infrastructure throughout the LIFT TOWER. The solution integrated:

  • A robust fibre backbone
  • Copper edge systems
  • Wireless access points
  • All necessary peripherals and hardware

This infrastructure supports seamless connectivity across the tower’s 15 floors, enabling high-performance operations and future-proofing the facility for evolving technological needs.

ON GOING PEACE OF MIND AND SUPPORT

Aliaxis benefits from MPR’s continued technical support and infrastructure expertise. The partnership ensures that the network remains resilient, scalable, and aligned with the tower’s operational goals. MPR’s proactive approach provides peace of mind, knowing the system is maintained to the highest standards.

THE RESULTS

The successful implementation of the new network has reinforced Aliaxis’s position as a leader in high-rise drainage and lift testing innovation. The LIFT TOWER now operates with enhanced connectivity, supporting its diverse functions—from testing and training to media production. This project highlights the strength of collaboration between Aliaxis and MPR Technical Services in delivering cutting-edge solutions for complex environments.